2022
DOI: 10.1016/j.eswa.2022.117269
|View full text |Cite
|
Sign up to set email alerts
|

A knowledge-driven constructive heuristic algorithm for the distributed assembly blocking flow shop scheduling problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 23 publications
(2 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…Its importance and popularity make optimization has been implemented in many areas, such as in computing system [1], transportation [2], mobile communication [3], production and manufacturing [4], healthcare [5], power system [6], home appliance [7], and so on. In production and manufacture, some study need optimization, such as in flow shop scheduling in multi factory environment [8], nozzle assignment in printed circuit board assembly [9], and job assignment in manufacture where there are several parallel machines [10], and so on. Several objectives in the manufacturing optimization problems are minimizing the completion time [8], total assembly time [9], make-span [11], maximizing service level [12], and so on.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Its importance and popularity make optimization has been implemented in many areas, such as in computing system [1], transportation [2], mobile communication [3], production and manufacturing [4], healthcare [5], power system [6], home appliance [7], and so on. In production and manufacture, some study need optimization, such as in flow shop scheduling in multi factory environment [8], nozzle assignment in printed circuit board assembly [9], and job assignment in manufacture where there are several parallel machines [10], and so on. Several objectives in the manufacturing optimization problems are minimizing the completion time [8], total assembly time [9], make-span [11], maximizing service level [12], and so on.…”
Section: Introductionmentioning
confidence: 99%
“…In production and manufacture, some study need optimization, such as in flow shop scheduling in multi factory environment [8], nozzle assignment in printed circuit board assembly [9], and job assignment in manufacture where there are several parallel machines [10], and so on. Several objectives in the manufacturing optimization problems are minimizing the completion time [8], total assembly time [9], make-span [11], maximizing service level [12], and so on. Meanwhile, the common objectives in the optimization work in the power system is higher energy harvesting [13], minimizing power loss [14], maximizing power point [15], and so on.…”
Section: Introductionmentioning
confidence: 99%