2018 IEEE 20th International Conference on High Performance Computing and Communications; IEEE 16th International Conference On 2018
DOI: 10.1109/hpcc/smartcity/dss.2018.00039
|View full text |Cite
|
Sign up to set email alerts
|

A Learning-Based Adjustment Model with Genetic Algorithm of Function Point Estimation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 12 publications
0
6
0
Order By: Relevance
“…In [55], the authors proposed a learning-based adjustment model for the FPA =using a Genetic Algorithm and analogybased estimation. They also used Language Type, Development Platform, Development Type, and 1st Database System as the crucial factors.…”
Section: Related Workmentioning
confidence: 99%
See 2 more Smart Citations
“…In [55], the authors proposed a learning-based adjustment model for the FPA =using a Genetic Algorithm and analogybased estimation. They also used Language Type, Development Platform, Development Type, and 1st Database System as the crucial factors.…”
Section: Related Workmentioning
confidence: 99%
“…Clustering Method References 1 Development Type (DT) [45], [46], [48], [49], [52], [55], [56], [58] 2 Development Platform (DP) [45], [50], [52], [54], [55], [56], [58] 3 Language Type (LT) [50], [51], [52], [55], [56], [57], [58] 4 Industry Sector (IS) [25], [36], [47], [48], [52], [53], [56] 5 Organization Type (OT) [45], [46], [54], [58] 6 Relative Size (RS) [47], [53], [56], [57] 7 Application Type (AT) [45], [46], [48] [56]…”
Section: Nomentioning
confidence: 99%
See 1 more Smart Citation
“…Over six hundred projects of the International Software Benchmarking Standards Group (ISBSG) dataset are used as a case study to validate the proposed solution. Liu et al [2] recommend more research to find alternative methods to select KIFs.…”
Section: Related Workmentioning
confidence: 99%
“…Software cost estimation is a cumbersome task because it requires the estimator to predict cost accurately at the planning phase of the project. Some software cost estimation methods are proposed over the years such as Function Point Analysis (FPA), Cost Constructive Model (COCOMO) I & II, Use Case Points (UCP) and story point [1][2][3][4][5]. Some researchers combine them with novel approaches to generate more accurate estimations of software projects.…”
Section: Introductionmentioning
confidence: 99%