2018
DOI: 10.1002/qre.2277
|View full text |Cite
|
Sign up to set email alerts
|

A linear‐time method for computing the ANOS of Bernoulli and Poisson CUSUM charts

Abstract: The average number of observations to signal (ANOS) is an important measure of the effectiveness of Bernoulli or Poisson cumulative sum (CUSUM) control charts. Being able to quickly and accurately calculate an ANOS vector facilitates effective control chart design. We present a linear-time method for computing the ANOS of Bernoulli CUSUM charts and generalize to Poisson CUSUM charts. This method overcomes computation challenges associated with previously existing methods.KEYWORDS average number of observations… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 6 publications
0
5
0
Order By: Relevance
“…Additionally, 59 papers incorporated the ATS in their analysis. In contrast, the ANOS was discussed in only five papers 40,44,62,230,232 . The AEQL was introduced in four studies, 46,63,207,219 while another five papers examined the AND 64,215,216,245 .…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…Additionally, 59 papers incorporated the ATS in their analysis. In contrast, the ANOS was discussed in only five papers 40,44,62,230,232 . The AEQL was introduced in four studies, 46,63,207,219 while another five papers examined the AND 64,215,216,245 .…”
Section: Resultsmentioning
confidence: 99%
“…59,61 It is defined as 𝐴𝑁𝑂𝑆 = 𝐴𝑅𝐿 × 𝑛. 62 • Overall performance indicators: When the performance of the control chart is measured over a wide range of shifts, then the performance metric is an overall measure of performance. The following are the most popular overall performance measures:…”
Section: Types Of Performance Indicatorsmentioning
confidence: 99%
See 2 more Smart Citations
“…The R matrix for the Bernoulli CUSUM was given by Bourke 15 and Pollard et al, 28 and the R matrix for the version of the geometric CUSUM where the CRL does not include the final nonconforming item was given by Bourke. 6 For completeness, the R matrix for the geometric CUSUM where the observation, 𝑌 𝑗 , in equation ( 2) includes the final nonconforming item is given below:…”
Section: Appendix a Details Of The Markov Chain Approachmentioning
confidence: 99%