2015
DOI: 10.1504/ijmme.2015.070367
|View full text |Cite
|
Sign up to set email alerts
|

A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0
3

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 35 publications
(13 citation statements)
references
References 0 publications
0
10
0
3
Order By: Relevance
“…Arena ® can also be integrated with other software such as Microsoft Excel and VBA to meet a desired need. Some other applications of the software both autonomous and/or integral have been reported in Pop-Andonov et al 2012, Askari-Nasab et al, (2012), Torkamani, (2013, and Chinbat and Takakuwa (2009).…”
Section: Arena® and Its Applications In Miningmentioning
confidence: 93%
“…Arena ® can also be integrated with other software such as Microsoft Excel and VBA to meet a desired need. Some other applications of the software both autonomous and/or integral have been reported in Pop-Andonov et al 2012, Askari-Nasab et al, (2012), Torkamani, (2013, and Chinbat and Takakuwa (2009).…”
Section: Arena® and Its Applications In Miningmentioning
confidence: 93%
“…La incertidumbre operacional se asocia a: (i) parámetros operacionales, aquellos que tienen relación con tiempos, velocidades y capacidades de los componentes utilizados en la operación; (ii) eventos operacionales, aquellos que afectan a la efectividad de los equipos, como detenciones programadas y fallas operacionales. Para generar cierta aleatoriedad, tanto en la incertidumbre asociada a parámetros como a eventos operacionales, se debe caracterizar la incertidumbre mediante estudios estadísticos de datos (Torkamani, 2013).…”
Section: Modelo De Simulaciónunclassified
“…Debido a la incertidumbre asociada a los equipos y a las interacciones existentes, resulta complejo analizar este sistema, siendo uno de los principales problemas a enfrentar la utilización eficiente de la flota de carguío y transporte, con el objetivo de minimizar los costos y maximizar la eficiencia. Los métodos deterministas no son apropiados para analizar este tipo de sistemas, debido a que poseen interacciones internas entre equipos que fallan de manera aleatoria (Torkamani, 2013), por lo que herramientas como simulación de eventos discretos resultan apropiadas para determinar dichas interacciones, aun cuando tiene la limitante de que no optimiza y sólo emula la operación (Banks, 1984).…”
Section: Introductionunclassified
“…Recent developments combine aspects of fleet management and short-term extraction sequencing for open pit mines with the motivation of creating synergies between the steps that are conventionally optimized separately; this, in turn, generates more efficient short-term plans (Fioroni et al 2008;L'Heureux et al 2013;Torkamani and Askari-Nasab 2015;Mousavi et al 2016a;Villalba Matamoros and Dimitrakopoulos 2016;Blom et al 2017;Kozan and Liu 2018;Upadhyay and Askari-Nasab 2018). Most of these recent approaches integrate shovel allocation decisions, shovel capacities and the cost of shovel movements in the production scheduling model.…”
Section: Introductionmentioning
confidence: 99%
“…Current research, however, has not incorporated the physical loss of shovel production due to time-consuming shovel movements within an industrial mining complex. Some recent models focus on extending equipment plans towards drilling and blasting activities (L'Heureux et al 2013;Kozan and Liu 2018), while others include additional decision variables related to optimal truck allocation (Fioroni et al 2008;Torkamani and Askari-Nasab 2015;Villalba Matamoros and Dimitrakopoulos 2016;Blom et al 2017;Upadhyay and Askari-Nasab 2018).…”
Section: Introductionmentioning
confidence: 99%