A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
31
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 82 publications
(32 citation statements)
references
References 26 publications
0
31
0
1
Order By: Relevance
“…DRC scheduling problem can be formally described as follows (Gong et al, 2018). A shop contains m machines (M1, M2, …, Mm) and w workers (W1, W2, …, Ww).…”
Section: Dual Resource Constrained (Drc) Systemmentioning
confidence: 99%
“…DRC scheduling problem can be formally described as follows (Gong et al, 2018). A shop contains m machines (M1, M2, …, Mm) and w workers (W1, W2, …, Ww).…”
Section: Dual Resource Constrained (Drc) Systemmentioning
confidence: 99%
“…Sánchez and Torres [9] studied a hand-intensive production flow-shop scheduling problem with variable worker productivity. Gong et al [10] introduced a flexible job shop scheduling problem with worker flexibility considerations and designed a new memetic algorithm to solve the corresponding problem. Furthermore, some review literatures concerning the workforce scheduling in product-oriented industries have been conducted.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Constraint (9) means the set of riders in each period is comprised of the beginner riders and skilled riders. Constraint (10) calculates the number of skilled riders at the beginning of each period, which is the sum of the remaining skilled riders from last period and the new recruited riders in last period. Constraint (11) represents the role transformation from beginners to skilled riders after training.…”
mentioning
confidence: 99%
“…Job 1 2 3 2 3 3 5 4 3 8 Job 2 2 4 3 2 2 3 3 5 7 Job 3 4 3 3 4 1 3 2 4 7 Job 4 4 5 2 3 1 2 1 2 5 Job 5 3 2 2 1 3 1 3 3 6 The decoding process is to select the right machine for each job and the right worker for each machine, determine the sequence of all operations and their starting and ending times, and finally obtain the objective functions value. This paper refers to the decoding method of literature [32], [36]- [37], the decoding process is detailed as follows:…”
Section: A Encoding and Decodingmentioning
confidence: 99%