2014
DOI: 10.1016/j.proeng.2014.10.555
|View full text |Cite
|
Sign up to set email alerts
|

A Meta Classification and Analysis of Contractor Selection and Prequalification

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
31
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 23 publications
(32 citation statements)
references
References 14 publications
1
31
0
Order By: Relevance
“…Nieto-Morote and Ruz-Vila (Nieto-Morote, Ruz-Vila, 2011) proposed a fuzzy approach for construction project risk assessment. Kog and Yaman (Kog, Yaman, 2014) analyzed and classified academic studies which were studied between 1992 -2013 for contractor selection problem. Taylan et al (Taylan et al, 2014) used FAHP and fuzzy TOPSIS methods for construction projects selection.…”
Section: Literature Revıewmentioning
confidence: 99%
“…Nieto-Morote and Ruz-Vila (Nieto-Morote, Ruz-Vila, 2011) proposed a fuzzy approach for construction project risk assessment. Kog and Yaman (Kog, Yaman, 2014) analyzed and classified academic studies which were studied between 1992 -2013 for contractor selection problem. Taylan et al (Taylan et al, 2014) used FAHP and fuzzy TOPSIS methods for construction projects selection.…”
Section: Literature Revıewmentioning
confidence: 99%
“…Due to the client's preference, project uniqueness, business environment, and locality of socio-economy (Newcombe 1990), the extent to which the multi-criteria approach is implemented varies from one project to another. In public projects, the tender evaluation has a number of boundaries and restrictions, including laws, regulations and procedures, but in private projects the tender evaluation process is more flexible, and more rational evaluation of criteria is usually adopted in the process (Kog, Yaman 2014). Contractors are not advised to use same competition strategies when they are competing for different types of construction projects simultaneously (Ye et al 2014).…”
Section: Introductionmentioning
confidence: 99%
“…As a result of these studies, several researches are conducted and several methods have emerged. The Contractor selection problems are still ongoing issue and updated constantly [3]. The bidding price has been the most important criterion affecting the Contractor selection in time.…”
Section: Introductionmentioning
confidence: 99%
“…made based on prices might cause greater losses in terms of other goals [3]. A wide variety of criteria have been proposed for Contractor selection [6][7] [8][4] [9].…”
Section: Introductionmentioning
confidence: 99%