2021
DOI: 10.17531/ein.2021.4.19
|View full text |Cite
|
Sign up to set email alerts
|

A method for evaluating and upgrading systems with parallel structures with forced redundancy

Abstract: The objects of the study are parallel-structure machine systems with redundancy associated with safety assurance of continuous material flow. The problem concerns systems in which the supply of materials takes place continuously (24 hours a day), and the system of operated machines must ensure the receipt and movement of the material at a strictly defined time and in the desired quantity. It is a system where the presence of a failure poses a threat to human life and environmental degradation. This paper prese… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 33 publications
0
3
0
Order By: Relevance
“…To handle the obtained process quality data, a structured procedure is devised in response to the huge scale, multiple types, and significant variability of quality data. This article divides product quality elements into six categories: human factors, equipment factors, raw material factors, process factors, environmental factors, and testing factors [33]. The aviation company's monitoring of the supplier's process quality data is fundamentally the process of overseeing and regulating these six criteria.…”
Section: B Data Structure Layermentioning
confidence: 99%
“…To handle the obtained process quality data, a structured procedure is devised in response to the huge scale, multiple types, and significant variability of quality data. This article divides product quality elements into six categories: human factors, equipment factors, raw material factors, process factors, environmental factors, and testing factors [33]. The aviation company's monitoring of the supplier's process quality data is fundamentally the process of overseeing and regulating these six criteria.…”
Section: B Data Structure Layermentioning
confidence: 99%
“…Structured interfaces refer to the physical dimension of service modules, while procedural interfaces refer to the service provided by this module. Procedural interfaces focus on integrating the offer of services and relating to the service provider and the customer [45].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In the general design assumptions, the energy demand is determined for the maximum power needed, with an assumption of ±20% fluctuations potentially occurring [46]. Systems with a higher level of risk have greater safeguards [46], sometimes up to 400% [59]. The unjustified oversizing of the energy demand is associated with unreasonable costs for the investment phase.…”
Section: Introductionmentioning
confidence: 99%