2009
DOI: 10.1016/j.eswa.2009.02.071
|View full text |Cite
|
Sign up to set email alerts
|

A minimized makespan scheduler with multiple factors for Grid computing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2010
2010
2024
2024

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(4 citation statements)
references
References 11 publications
0
4
0
Order By: Relevance
“…Energy policies establish the managing of grid resources. While other research attempts to reduce the makespan (Tseng, Chin, & Wang, 2009), the policies shown in this work aim to describe and compute what to do with a resource when it finishes the exe- cution of a job. Thus, each energy policy decides to either leave resources switched on or switch them off depending on the purpose of the policy.…”
Section: Scheduling Energy Policiesmentioning
confidence: 99%
“…Energy policies establish the managing of grid resources. While other research attempts to reduce the makespan (Tseng, Chin, & Wang, 2009), the policies shown in this work aim to describe and compute what to do with a resource when it finishes the exe- cution of a job. Thus, each energy policy decides to either leave resources switched on or switch them off depending on the purpose of the policy.…”
Section: Scheduling Energy Policiesmentioning
confidence: 99%
“…The DR is applied for minimising the makespan and is compared to 5 existing DRs. In [42] the authors compare the performance of 5 DRs when considering setup times and three objectives, the makespan, total weighted tardiness, and computing cost. The authors combine the ATCS rule with the minimum completion time strategy to improve its performance.…”
Section: A Problem Specific Heuristics 1) Dispatching Rulesmentioning
confidence: 99%
“…One is based on standard strategies, very well known as classical scheduling Heuristics such as FCFS [64], DSJF [65], HTSA [66], FT Min-Min [67] etc. Second is Modified Conventional, which is based on some modification done in standard scheduling approaches such as modified FCFS [68], modified MCT [69] etc. And the last one is QoS based conventional, which is Standard Conventional Heuristics along with Quality of Service as required by the user.…”
Section: A Conventional Scheduling Heuristicsmentioning
confidence: 99%