A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry

Abstract: Newcastle University ePrints | eprint.ncl.ac.uk Chansombat S, Pongcharoen P, Hicks C. A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. AbstractThe scheduling literature is extensive, but much of this work is theoretical and does not capture the complexity of real world systems. Capital goods companies produce products with deep and complex product structures, each of which requires the coordination of jobbing, batch, flow an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
45
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 58 publications
(45 citation statements)
references
References 101 publications
0
45
0
Order By: Relevance
“…To linearize such a function, one additional decision variable is required, and the number of additional constraints equals the number of non-zero segments. For our 3segment function (16), the number of non-zero segments is two. Therefore, the numbers of additional decision variables and constraints required is equal to those required by the absolutevalue function.…”
Section: Solution Methodologymentioning
confidence: 99%
“…To linearize such a function, one additional decision variable is required, and the number of additional constraints equals the number of non-zero segments. For our 3segment function (16), the number of non-zero segments is two. Therefore, the numbers of additional decision variables and constraints required is equal to those required by the absolutevalue function.…”
Section: Solution Methodologymentioning
confidence: 99%
“…Bertolini et al (2019) conducted comparison of new metaheuristics, for the solution of an integrated jobs-maintenance scheduling problem. Chansombat et al (2019) proposed a mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. Miyata et al (2019a) incorporated preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization.…”
Section: Literature Reviewmentioning
confidence: 99%
“…While, emergent failures, which happen due to the occurrence of emergency events need immediate repairs due to avoid failure consequences; severity or production losses (Seif et al, 2018;Tonke & Grunow, 2018). In previous literature, maintenance scheduling problem has been extensively studied (Irawan et al, 2017;Kiefer et al, 2018;Chansombat et al, 2019). However, maintenance engineers are still challenged to handle repairs scheduling of emergent failures.…”
Section: Introductionmentioning
confidence: 99%
“…A proactive approach to solve integrated production scheduling and maintenance planning problem in a multi-component flow shop application is developed by Cui et al (2018) in order to optimize the bi-objective of quality robustness and solution robustness with failure uncertainty. In another study, Chansombat et al (2018) presents a novel mixed integer linear programming model for simultaneously solving the integrated problem for a multicomponent production system in the capital goods industry. Najid et al (2011) addressed the problem of finding optimal production lot sizes of various items by taking into account demand shortage and the reliability of the production line.…”
Section: Multi-machine Modelsmentioning
confidence: 99%