IPTC 2007: International Petroleum Technology Conference 2007
DOI: 10.3997/2214-4609-pdb.147.iptc11795
|View full text |Cite
|
Sign up to set email alerts
|

A Model for Short-Term Supply Chain Management of a LNG Production System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2008
2008
2011
2011

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The optimisation of capital allocation using linear programming was addressed for instance by Santos and Harman (1999). With respect to the gas industry, Selot et al (2007) for example developed an optimisation model for a gas production system for a short term (two days to two weeks) supply planning periods.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The optimisation of capital allocation using linear programming was addressed for instance by Santos and Harman (1999). With respect to the gas industry, Selot et al (2007) for example developed an optimisation model for a gas production system for a short term (two days to two weeks) supply planning periods.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The downstream boundary is typically a constant pressure on the inlet separator. A few publications on RTPO for the production chain from the reservoir to export are available; Foss and Halvorsen (2009), Selot et al (2007). Commercial products for RTPO are available, but not widely used.…”
Section: Introductionmentioning
confidence: 99%