A Monte-Carlo Simulation Method for Setting the Underfrequency Load Shedding Relays and Selecting the Spinning Reserve Policy in Autonomous Power Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
18
0

Year Published

2006
2006
2025
2025

Publication Types

Select...
8
2

Relationship

1
9

Authors

Journals

citations
Cited by 51 publications
(18 citation statements)
references
References 7 publications
0
18
0
Order By: Relevance
“…A typical reserve target for isolated systems is the largest power output among the generating units [31]. However, several publications (e.g.…”
Section: On Security Constraintsmentioning
confidence: 99%
“…A typical reserve target for isolated systems is the largest power output among the generating units [31]. However, several publications (e.g.…”
Section: On Security Constraintsmentioning
confidence: 99%
“…Depending on the dc-link configuration, length of cables and location, availability and outage rate varies, but at least 2-3 trips per year can be reasonably expected [13]. This is close to the 3-6 trips of a typical conventional generator [14]. However, while an isolated system will be able to withstand the trip of a conventional generator, this is not necessarily the case when the interconnection trips.…”
Section: Spinning Reserve Considerationsmentioning
confidence: 99%
“…The electric power utilities adopt different approaches to this problem, which are mainly based on their experience and the robustness of their systems [8]. Due to new interconnections different UFLS that were previously designed for a specific power system find themselves jointly operating in a different environment (see Fig.…”
Section: ) Different (Baltic's and Spain's) Ufls Schemes Jointly Opementioning
confidence: 99%