Intelligent Data Engineering and Automated Learning - IDEAL 2007
DOI: 10.1007/978-3-540-77226-2_97
|View full text |Cite
|
Sign up to set email alerts
|

A Multi-agent System Approach to Power System Topology Verification

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Physical grid parameters and network constraints that can be abstracted to MG were considered by the last two mentioned works. In Wilkosz [101], MAS, in connection with Petri nets, was used to verify the power-system topology during real time to avoid errors in the power network connectivity models.…”
Section: Mg Security Stability and Protectionmentioning
confidence: 99%
“…Physical grid parameters and network constraints that can be abstracted to MG were considered by the last two mentioned works. In Wilkosz [101], MAS, in connection with Petri nets, was used to verify the power-system topology during real time to avoid errors in the power network connectivity models.…”
Section: Mg Security Stability and Protectionmentioning
confidence: 99%
“…If the conditions ( 14) are fulfilled, then we say that the UIs WPy, WQy are"zero" ones and zero is inserted into (10) instead of real values of WPy, WQy.…”
Section: Zkl Vkmentioning
confidence: 99%
“…The idea of utilization of UIs for the examination of correctness of the PS topology model is described in [8] and [9]. That idea is used for a design of a multi-agent system for PS TV [10] (and other papers of the authors).…”
Section: Introductionmentioning
confidence: 99%