2016
DOI: 10.1016/j.autcon.2016.08.007
|View full text |Cite
|
Sign up to set email alerts
|

A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
42
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
5
4
1

Relationship

0
10

Authors

Journals

citations
Cited by 90 publications
(42 citation statements)
references
References 21 publications
0
42
0
Order By: Relevance
“…However, examined three types of configurators could only fit for a certain phase of projects lifecycle, and lack connections between each other. Second, previous studies identify multiple module drivers, such as module connections, transportation distance and production time (Anvari, Angeloudis and Ochieng, 2016;Said, Chalasani and Logan, 2017;Salama et al, 2017). However, due to the uniqueness of construction projects, module drivers should be identified, and more importantly, quantified for different building types.…”
Section: Discussionmentioning
confidence: 99%
“…However, examined three types of configurators could only fit for a certain phase of projects lifecycle, and lack connections between each other. Second, previous studies identify multiple module drivers, such as module connections, transportation distance and production time (Anvari, Angeloudis and Ochieng, 2016;Said, Chalasani and Logan, 2017;Salama et al, 2017). However, due to the uniqueness of construction projects, module drivers should be identified, and more importantly, quantified for different building types.…”
Section: Discussionmentioning
confidence: 99%
“…[94] proposed a simulation model for disturbance assessment to evaluate the uncertainty of PCSCM, which can prevent various disturbances in time and improve profits. In addition, simulation can effectively improve the professional quality of practitioners and their understanding of PCSC concepts and knowledge [96].…”
Section: Pc Supply Chain Process Design Based On Simulationmentioning
confidence: 99%
“…DfMA is a simultaneous design and engineering approach where the parts are manufactured and (sub-) assembled in a factory or warehouse, before being delivered to a construction site for installation [13]. DfMA using prefabricated techniques can provide benefits on construction schedules, costs, labour, safety and quality.…”
Section: Design For Manufacture and Assemblymentioning
confidence: 99%