2021
DOI: 10.1016/j.eswa.2021.115214
|View full text |Cite
|
Sign up to set email alerts
|

A multi-objective multi-micro-swarm leadership hierarchy-based optimizer for uncertain flexible job shop scheduling problem with job precedence constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 17 publications
(6 citation statements)
references
References 47 publications
0
6
0
Order By: Relevance
“…Li et al [9] mixed the genetic algorithm and taboo search algorithm to resolve the FJSSP problem. Zhenwei et al [10] studied the uncertain FJSSP with job priority requirements. Changxing et al [11] constructed an FJSSP model with maximum completion time and machine load as optimization objectives, and a mixed elite retention mechanism and summation search algorithm.…”
Section: Introductionmentioning
confidence: 99%
“…Li et al [9] mixed the genetic algorithm and taboo search algorithm to resolve the FJSSP problem. Zhenwei et al [10] studied the uncertain FJSSP with job priority requirements. Changxing et al [11] constructed an FJSSP model with maximum completion time and machine load as optimization objectives, and a mixed elite retention mechanism and summation search algorithm.…”
Section: Introductionmentioning
confidence: 99%
“…Chen et al used the interval grey number to represent the processing time of jobs (Xie and Chen, 2018) and constructed grey programming models to solve the scheduling problem of flexible job shop (Chen et al, 2022) and flexible flow shop (Wang and Xie, 2021) in an uncertain environment. Zhu and Zhou concentrated on the flexible job shop scheduling problem with job precedence constraints and interval grey processing time (G-FJSP-JPC) under the objective of minimizing the interval grey makespan (Zhu and Zhou, 2020); meanwhile, they devised specific operators for dealing with interval grey time numbers to acquire precise grey schedules and proposed a novel multi-micro-swarm leadership hierarchy-based optimization algorithm (M2SLHO) tackle G-FJSP-JPC (Zhu and Zhou, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…To deal with the uncertain processing time, interval grey number processing time is an emerging method (Li and Li, 2023; Liz, 2022)which has attracted the attention of some scholars in recent years due to its simple form and special significance (Wang and Xie, 2021; Zhu and Zhou, 2020, 2021). Based on the Grey System Theory (Deng, 1982), the uncertain processing time is expressed as interval grey numbers.…”
Section: Introductionmentioning
confidence: 99%