A new approach in the cost estimation of a hydroelectric power plants in Türkiye based on geographical features

Abstract: Summary In this study, a new geographically based equation models with four terms and seven parameters are proposed for the total cost estimation of Hydroelectric Power Plants (HEPP). For this purpose, 25 basins in Türkiye are grouped into eight parts considering the similarities of their precipitation and elevation characteristics. For each group, the equation's parameters which is used to predict the cost of HEPPs, are determined by using the data of 67 HEPPs constructed over the last 6 years. In the literat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
3
0
1

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 26 publications
0
3
0
1
Order By: Relevance
“…The difference is that it makes use of carbon capture and storage. Unlike these methods, it is defined as 'green' hydrogen produced by RES's [4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19].…”
Section: Introductionmentioning
confidence: 99%
“…The difference is that it makes use of carbon capture and storage. Unlike these methods, it is defined as 'green' hydrogen produced by RES's [4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19].…”
Section: Introductionmentioning
confidence: 99%
“…Bir bölgenin potansiyelinin değerlendirilmesi ve yatırıma dönüştürülmesi için maliyet bilgileri önemlidir. Bu öneme binaen, maliyet analizi ve tahmini araştırmacılar tarafından ele alınan güncel bir konudur [3, [10][11][12][13][14][15][16][17]. Araştırmacılar tarafından maliyet analizleri, açık deniz RES'ler için yapılmış ve denklem modelleri önerilmiştir [1, [11][12][13]18].…”
Section: Introductionunclassified
“…In the studies, cost correlations based on the installed power and head parameters of electromechanical equipment 789 have been developed (Mishra et al, 2011). In addition to these parameters, the flow parameter has been added to the equation model as a new approach for cost estimation (Cavazzini et al, 2016;Çelikdemir and Özdemir, 2022). In such a way, the smallest mean error values with the best performance were obtained.…”
Section: Introductionmentioning
confidence: 99%
“…In later studies, better results were obtained by developing equation model parameters. Optimization methods were used to determine equation model parameters (Çelikdemir, S. and Ozdemir 2021;Çelikdemir and Özdemir 2022). Further, cost estimates were obtained with less error rate.…”
Section: Introductionmentioning
confidence: 99%