2010
DOI: 10.1109/tpwrs.2009.2031908
|View full text |Cite
|
Sign up to set email alerts
|

A New Approach to Continuous Latency Compensation With Adaptive Phasor Power Oscillation Damping Controller (POD)

Abstract: Abstract-Latency or delay in remote feedback signals can adversely affect the closed-loop damping performance. Accurate time-stamp information at both (PMU location and control center) ends offers a possibility to continuously compensate for time-varying latency. In this paper, an adaptive phasor power oscillation damping controller (APPOD) is proposed wherein the rotating coordinates for phasor extraction are adjusted to account for the change in phase caused due to the delay. The oscillatory component of the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
38
0

Year Published

2010
2010
2021
2021

Publication Types

Select...
7
3

Relationship

1
9

Authors

Journals

citations
Cited by 102 publications
(38 citation statements)
references
References 22 publications
0
38
0
Order By: Relevance
“…The total time delay in the control loop in CSG's WADC is about 110 ms, of which 40 ms is from the PMU's data processing [40]. Adaptive WACS designed to include transmission delays from 0 to 1.4 s is studied in [44], [45]. Loss of remote signals may be solved by a decentralized control structure [32].…”
Section: Wide-area Damping Controlmentioning
confidence: 99%
“…The total time delay in the control loop in CSG's WADC is about 110 ms, of which 40 ms is from the PMU's data processing [40]. Adaptive WACS designed to include transmission delays from 0 to 1.4 s is studied in [44], [45]. Loss of remote signals may be solved by a decentralized control structure [32].…”
Section: Wide-area Damping Controlmentioning
confidence: 99%
“…9. The details of the system can be found in [29]. The real power flow in line 45-35 was used as the feedback signal to damp power oscillations with a thyristor controlled series capacitor (TCSC) installed on the tie-line connecting the buses 18 and 50.…”
Section: E Case Study On a Larger Power Systemmentioning
confidence: 99%
“…Several techniques have been reported in the literature to tackle the adverse impact of latency or delay involved in communicating the remote signals [20,21,22]. Another potential problem could be low data rate/bandwidth availability which is likely to be encountered for networked communication if WAMS infrastructure were to be shared between multiple data intensive services in the future.…”
Section: Introductionmentioning
confidence: 99%