Day 3 Thu, October 29, 2015 2015
DOI: 10.4043/26129-ms
|View full text |Cite
|
Sign up to set email alerts
|

A New Boosting Concept: Pumps Installed Inside Production Risers in FPSOs

Abstract: In oilfield exploitation, pumping is one of the most productive artificial lift methods. The use of downhole pumps, where applicable, allows increasing production. However, service life of this type of systems may be short, around 2.5 years for electrical submersible pumps -ESPs, one of the most widely used types. Furthermore, failures in wet completion subsea wells require tubing removal, a heavy workover operation, demanding high costs offshore rigs. Besides, due to production halt, revenues are impacted.As … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Unlike electrical or mechanical failures, operational failures are tied to conditions of the wellbore fluids and thermodynamics that may result in mechanical or electrical failures. These failures can be a resultant of severe downhole temperature, sudden change in pressure gradients, introduction of gaseous phase due to reservoir pressure decline, and deposition of scale, asphaltene, or wax on the downhole ESP components (Rodrigues et al 2015;Morrison et al 2014;Nallipogu et al 2012). In many ESP cases worldwide, operational failures resulted in the shortening of the ESP mean time between failure significantly and impact the operational costs greatly.…”
Section: Introductionmentioning
confidence: 99%
“…Unlike electrical or mechanical failures, operational failures are tied to conditions of the wellbore fluids and thermodynamics that may result in mechanical or electrical failures. These failures can be a resultant of severe downhole temperature, sudden change in pressure gradients, introduction of gaseous phase due to reservoir pressure decline, and deposition of scale, asphaltene, or wax on the downhole ESP components (Rodrigues et al 2015;Morrison et al 2014;Nallipogu et al 2012). In many ESP cases worldwide, operational failures resulted in the shortening of the ESP mean time between failure significantly and impact the operational costs greatly.…”
Section: Introductionmentioning
confidence: 99%