2022
DOI: 10.1007/s12205-022-1258-z
|View full text |Cite
|
Sign up to set email alerts
|

A New Calculation Method for Tunneling-Caused Stratum Settlement

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 14 publications
(3 citation statements)
references
References 43 publications
0
3
0
Order By: Relevance
“…With the rapid expansion of urban railways, the construction of subway tunnels has progressively revealed the evolution features of enormous burial depth, large sections, and big spans [1][2][3][4][5]. The increase in the number of large-section tunnels has also created some engineering challenges, such as surrounding rock deformation [6][7][8], support structure instability [9][10][11], and lining cracking [12][13][14], which have seriously threatened project construction and operation safety. Especially because of the complex structure, large span, and cumbersome working procedures, multi-arch tunnels are prone to large surrounding rock distortion and supporting structure instability.…”
Section: Introductionmentioning
confidence: 99%
“…With the rapid expansion of urban railways, the construction of subway tunnels has progressively revealed the evolution features of enormous burial depth, large sections, and big spans [1][2][3][4][5]. The increase in the number of large-section tunnels has also created some engineering challenges, such as surrounding rock deformation [6][7][8], support structure instability [9][10][11], and lining cracking [12][13][14], which have seriously threatened project construction and operation safety. Especially because of the complex structure, large span, and cumbersome working procedures, multi-arch tunnels are prone to large surrounding rock distortion and supporting structure instability.…”
Section: Introductionmentioning
confidence: 99%
“…Due to the different methods of rock classification, serious communication problems arose during the tunnel project, which was designed according to Russian norms and built according to Chinese standards. Coupled with the implementation of the "Belt and Road" initiative, there will be tunnel projects designed according to Russian norms and built by China in the countries along the route (Song et al, 2019;Tian et al, 2019;Wang et al, 2022). Differences in the methods of rock classification can lead to lots of problems.…”
Section: Introductionmentioning
confidence: 99%
“…For the ground settlement caused by shield or pipe jacking engineering, the theoretical analysis method [3,4], empirical formula method [5][6][7][8], and numerical simulation method [9,10] are usually used to study it. In terms of shield ground settlement, Fang et al [11] proved the influence of tunnel depth and ground loss rate on longitudinal ground settlement caused by shield construction through a series of model tests.…”
Section: Introductionmentioning
confidence: 99%