Search citation statements
Paper Sections
Citation Types
Year Published
Publication Types
Relationship
Authors
Journals
The ultimate objective for cementing a casing string is to achieve long-term integrity of the well. This can be achieved through long-term zonal isolation between the penetrated formations with appropriate mechanical properties, low permeability, and shear bond strength properties provided by the cement sheath placed in the corresponding annuli. Experiences in the Hassi-Messaoud field have shown that zonal isolation is a very complex problem for some formations such as the LD2 zone, which exhibits, in some cases, corrosive fluids and highly saline formations as well as lost circulation zones. Cementing operations are critical and the need for cementing systems capable of solving these problems is crucial. This paper focuses on the factors that have contributed to the potential failure of the existing cement system. Stress modeling has been used to select the appropriate cement system to overcome the challenges faced by the cement sheath in this type of environment. Stress analysis calculations, combined with mechanical properties testing of the cement system, has suggested the use of a novel cementing technology. This new system has been able to solve these problems to provide flexibility, improve corrosion control, expansion properties of the set cement, reduce the chances of microannulus creation, and therefore avoid overpressurization of the annulus casing. To ensure correct cement placement in the lost circulation zones, this slurry system has been successfully combined with fibers specifically engineered for cement slurries. This technology has been a cost-effective solution for cementing 12 1/4-in sections in the Hassi-Messaoud field and 8 1/2-in sections in the Berkaoui and Hassi-Guettar fields. Field results have proven that significant workover costs, up to USD 1 million on wells in production, can be saved with the application of this technology. Introduction and Hassi-Messaoud Field Characteristics Zonal isolation is one of the primary objectives of cementing a well and if not achieved, may result in fluids migration to surface, microannulus, annular pressure development and alteration of the integrity of the cement sheath. This problem, if encountered, can be time and money consuming for the operating company causing workover and remedial work extra costs. Algeria is a major hydrocarbons producer in Africa, producing currently 1,300,000 bbl/day of crude oil and exporting about 70 billion m3 of gas per year. By far the largest oil field in Algeria is Hassi-Messaoud, located in the center of the country, which produces about 350,000–400,000 bbl/day of 46o API crude, down from 550,000 bbl/day in the 1970s, but up from 300,000 bbl/day in 1989. The Hassi-Messaoud area contains an estimated 6.4 billion barrels, just below 60% of the country's proven oil reserves. It is expected to double production from the field to 700,000–750,000 bbl/day within the next 3 years. In order to satisfy the increasing market demand, the Hassi-Messaoud field is currently under important development. The Hassi-Messaoud field is characterized by a very thick sandstone reservoir covering an area of 2000 km2. The producing layers occur at an average depth of 3400 m and are located in the Cambrian Ra, R2 and R3. In the past few years, horizontal wells in Hassi-Messaoud field have started to be drilled in order to optimize the reservoir contact.1 In most cases a 7-in. liner is landed at a depth corresponding to the top of Cambrian Reservoir Ra, corresponding at a deviation of 45° and a 6-in. drain is drilled to target depth (TD) inside the reservoir Ra, R2 and R3 to a measured depth (MD) of an average of 4300 m, corresponding to a true vertical depth (TVD) of 3400m and an inclination of 89°. The 6-in. section across the Cambrian is then completed by production tubing in open hole (Fig. 1).
The ultimate objective for cementing a casing string is to achieve long-term integrity of the well. This can be achieved through long-term zonal isolation between the penetrated formations with appropriate mechanical properties, low permeability, and shear bond strength properties provided by the cement sheath placed in the corresponding annuli. Experiences in the Hassi-Messaoud field have shown that zonal isolation is a very complex problem for some formations such as the LD2 zone, which exhibits, in some cases, corrosive fluids and highly saline formations as well as lost circulation zones. Cementing operations are critical and the need for cementing systems capable of solving these problems is crucial. This paper focuses on the factors that have contributed to the potential failure of the existing cement system. Stress modeling has been used to select the appropriate cement system to overcome the challenges faced by the cement sheath in this type of environment. Stress analysis calculations, combined with mechanical properties testing of the cement system, has suggested the use of a novel cementing technology. This new system has been able to solve these problems to provide flexibility, improve corrosion control, expansion properties of the set cement, reduce the chances of microannulus creation, and therefore avoid overpressurization of the annulus casing. To ensure correct cement placement in the lost circulation zones, this slurry system has been successfully combined with fibers specifically engineered for cement slurries. This technology has been a cost-effective solution for cementing 12 1/4-in sections in the Hassi-Messaoud field and 8 1/2-in sections in the Berkaoui and Hassi-Guettar fields. Field results have proven that significant workover costs, up to USD 1 million on wells in production, can be saved with the application of this technology. Introduction and Hassi-Messaoud Field Characteristics Zonal isolation is one of the primary objectives of cementing a well and if not achieved, may result in fluids migration to surface, microannulus, annular pressure development and alteration of the integrity of the cement sheath. This problem, if encountered, can be time and money consuming for the operating company causing workover and remedial work extra costs. Algeria is a major hydrocarbons producer in Africa, producing currently 1,300,000 bbl/day of crude oil and exporting about 70 billion m3 of gas per year. By far the largest oil field in Algeria is Hassi-Messaoud, located in the center of the country, which produces about 350,000–400,000 bbl/day of 46o API crude, down from 550,000 bbl/day in the 1970s, but up from 300,000 bbl/day in 1989. The Hassi-Messaoud area contains an estimated 6.4 billion barrels, just below 60% of the country's proven oil reserves. It is expected to double production from the field to 700,000–750,000 bbl/day within the next 3 years. In order to satisfy the increasing market demand, the Hassi-Messaoud field is currently under important development. The Hassi-Messaoud field is characterized by a very thick sandstone reservoir covering an area of 2000 km2. The producing layers occur at an average depth of 3400 m and are located in the Cambrian Ra, R2 and R3. In the past few years, horizontal wells in Hassi-Messaoud field have started to be drilled in order to optimize the reservoir contact.1 In most cases a 7-in. liner is landed at a depth corresponding to the top of Cambrian Reservoir Ra, corresponding at a deviation of 45° and a 6-in. drain is drilled to target depth (TD) inside the reservoir Ra, R2 and R3 to a measured depth (MD) of an average of 4300 m, corresponding to a true vertical depth (TVD) of 3400m and an inclination of 89°. The 6-in. section across the Cambrian is then completed by production tubing in open hole (Fig. 1).
Cementing is an important factor in drilling and completion operations. Good cementing practices are required for a proper advancing in drilling and production operations. Successful cementing practices start with the design of effective cement slurries. However, to the best of the authors’ knowledge, there are no standard guidelines to help drilling engineers and scientists in the effective design of optimal cement slurries to be used in different well sections. The objective of this paper is to propose a set of guidelines for the optimal design of cement slurries, by integrating current best practices through a decision-making system based on Artificial Bayesian Intelligence. Best cementing practices collected from data, models, and experts’ opinions, are integrated into a Bayesian Network BN to simulate likely scenarios of its use, that will honor efficient designs when dictated by varying well objectives, well types, temperatures, pressures, and, drilling fluids. The proposed decision-making model follows a causal and an uncertainty-based approach capable of simulating realistic conditions on the use of cement slurries during drilling and completion operations. For instance, well sections and drilling operations dictate the use of the proper cement design which may include the use of specific additives according to the particular modeling scenarios. These include operations on surface casing, top jobs, intermediate casings, cementing in weak formations, squeeze treatment, kickoff and isolation plugs, horizontal, and vertical completions, among others. Potential operational problems that can lead to cementing failures are also discussed. Different methods of investigation and recommendations are presented in detail.
Recently discovered Haynesville gas-shale trends have transformed the regional and global outlook for natural gas supply, but offer unique challenges to the operator and service company during mud removal, cementing, and completion operations. To counter these challenges, recent advances include improved drilling, centralization, mud-removal, cementing best practices and implementing a broad particle size distribution-engineered (PSDE) cement system for use in high temperature horizontal intervals reaching across high pressure, high temperature (HPHT) gas-shale trends. For PSDE cement systems, rheological properties are based on inter-particulate interactions to achieve the desired viscosity and not based on polymeric extenders/antisettling additives. Since PSDE fluids are not dependent on polymeric thermal thinning behavior, they demonstrate consistent rheological properties over a wide temperature range and are more suitable for placement in narrow annuli.In this paper, Haynesville cement placement and extensive laboratory testing best practices will be discussed. Also, a case study will be presented that describes a typical and successful placement of PSDE cement fluid in the Haynesville shale at bottom hole circulating temperatures (BHCT) up to 182 o C [360 o F] and bottom hole pressures (BHP) up to 82.7 MPa [12,000 psi]. After successful job completion and time allowed for the cement to properly set, an annular seal pressure test was successfully completed, with minimal pressure bleed-off.Since introduction in 2009, over 390 production jobs have been successfully cemented using the PSDE cement technology, with 99.5% placement success rate. Acquired well head pressures (WHP) were less than or equal to predicted WHP for most production jobs. PSDE Cement Technology has become a proven approach for cementing high-temperature, horizontal tightgas shale environments in relatively narrow annuli where fluid stability and zonal isolation are needed during placement and subsequent hydraulic fracturing treatments. This approach has been applied to Haynesville and Eagleford shale horizontal reach production wells and is being investigated for use in other high temperature, high pressure applications.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.