2020
DOI: 10.1016/j.jmsy.2020.08.006
|View full text |Cite
|
Sign up to set email alerts
|

A new environment-aware scheduling method for remanufacturing system with non-dedicated reprocessing lines using improved flower pollination algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 29 publications
(4 citation statements)
references
References 38 publications
0
4
0
Order By: Relevance
“…It was used to obtain the optimal value recovery options for used components and to recover valuable components from EOL products. Shi et al [117] proposed a new environment-aware scheduling model for the remanufacturing system. An improved flower pollination algorithm with a new two-dimensional representation scheme was employed, and the results obtained were compared against six baseline algorithms (different variants of genetic algorithm, simulated annealing, and particle swarm optimization) for scheduling problems.…”
Section: Optimization Techniques-based Methodsmentioning
confidence: 99%
“…It was used to obtain the optimal value recovery options for used components and to recover valuable components from EOL products. Shi et al [117] proposed a new environment-aware scheduling model for the remanufacturing system. An improved flower pollination algorithm with a new two-dimensional representation scheme was employed, and the results obtained were compared against six baseline algorithms (different variants of genetic algorithm, simulated annealing, and particle swarm optimization) for scheduling problems.…”
Section: Optimization Techniques-based Methodsmentioning
confidence: 99%
“…Yu and Lee (2018) studied the distribution and sequencing of three remanufacturing subsystems with component matching requirements. In our previous work, Shi et al (2020) proposed an environment-aware scheduling model for solving the problem of remanufacturing scheduling, which coordinates the three subsystems to optimize the total completion time in consideration of environmental factors. However, the above works did not consider the different types and degrees of damage caused by the various operation conditions of EOL products, which complicate the reprocessing routes of defective components.…”
Section: Related Workmentioning
confidence: 99%
“…The number of operations in each reprocessing route was randomly generated from 2 to 4. Furthermore, inspired by Shi et al (2020), several other related parameters, were randomly generated as shown in Table 1. Inspired by Alcan and Bas ¸lıgil (2012), the number of parallel workstations in the disassembly (reassembly) subsystem was set to 3.…”
Section: Experimental Designmentioning
confidence: 99%
“…Yu and Lee (2018b) considered a due-date-based objective to minimize the total family tardiness in the job shop scheduling problem with job families. Shi et al (2020) proposed an energy-aware remanufacturing scheduling method for the entire remanufacturing system with non-dedicated reprocessing lines. Fu et al (2021) focused on a stochastic multi-objective remanufacturing scheduling problem that integrates disassembly, reprocessing, and reassembly sub-systems.…”
Section: A Job Shop Scheduling Problemmentioning
confidence: 99%