2022
DOI: 10.3390/axioms11070306
|View full text |Cite
|
Sign up to set email alerts
|

A New Interior Search Algorithm for Energy-Saving Flexible Job Shop Scheduling with Overlapping Operations and Transportation Times

Abstract: Energy-saving scheduling has been pointed out as an interesting research issue in the manufacturing field, by which energy consumption can be effectively reduced through production scheduling from the operational management perspective. In recent years, energy-saving scheduling problems in flexible job shops (ESFJSPs) have attracted considerable attention from scholars. However, the majority of existing work on ESFJSPs assumed that the processing of any two consecutive operations in a job cannot be overlapped.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 56 publications
0
0
0
Order By: Relevance