2018
DOI: 10.1080/0305215x.2018.1476501
|View full text |Cite
|
Sign up to set email alerts
|

A new model for open-pit production and waste-dump scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
8
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 29 publications
(8 citation statements)
references
References 35 publications
0
8
0
Order By: Relevance
“…According to Wang and Butler (2007) and Li et al (2016), the shortest route to the dumping point would minimise the haulage cost; however, the dumping point constantly changes its position as the dump progresses and, inevitably, at some point in time, haulage routes will be longer. Several studies addressing waste sequence optimisation using computational algorithms have been published in recent years and provide important information to understand the waste impact in block sequencing and a project's net present value (NPV) (Li et al 2012, 2013; Fu et al 2016).…”
Section: Introductionmentioning
confidence: 99%
“…According to Wang and Butler (2007) and Li et al (2016), the shortest route to the dumping point would minimise the haulage cost; however, the dumping point constantly changes its position as the dump progresses and, inevitably, at some point in time, haulage routes will be longer. Several studies addressing waste sequence optimisation using computational algorithms have been published in recent years and provide important information to understand the waste impact in block sequencing and a project's net present value (NPV) (Li et al 2012, 2013; Fu et al 2016).…”
Section: Introductionmentioning
confidence: 99%
“…Opportunities to minimise the cost of rehabilitation and long-term monitoring can be achieved by decreasing the size of waste dumps and ensuring there is an appropriate amount of material to encapsulate acid generating waste. For instance, modelling the haulage costs of transporting waste material to the appropriate destination and considering the impact of rehandling material to confine waste dumps during the reclamation process can help reduce costs [21].…”
Section: Introductionmentioning
confidence: 99%
“…Rimélé and Dimitrakopoulos [22] and Zuckerberg et al [23] each propose a model that opens in-pit waste dump and tailings disposal areas to minimise the footprint of expit waste. Fu et al [21] and Badiozamani and Askari-Nasab [24] define mixed integer programs that simultaneously optimise the open-pit production schedule while considering waste disposal; however, these models consider substantially smaller optimisation problems and do not account for uncertainty. Each of these methods expands on past research [25,26] that independently optimise the waste dump schedule after pre-determining the extraction sequence, leading to sub-optimal solutions.…”
Section: Introductionmentioning
confidence: 99%
“…For better economic benefits and lower cost, inpit dumping with end-wall slope partially covered has been proven to be effective [14], with the disadvantage of extra costs when materials transferred from the uncovered zone [15,16]. e overburden management [17], dumping scheduling [18][19][20], mining depth, bottom width and inpit dumping cover height [21,22] will be the main research focus for a long time. Also, biological reclamation was brought out to keep the long term stability of overburden dump slope, with the numerical modeling analyzed to be feasible [23,24].…”
Section: Introductionmentioning
confidence: 99%