2016
DOI: 10.1088/1757-899x/161/1/012099
|View full text |Cite
|
Sign up to set email alerts
|

A new model of Ishikawa diagram for quality assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
47
0
13

Year Published

2019
2019
2022
2022

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 97 publications
(60 citation statements)
references
References 1 publication
0
47
0
13
Order By: Relevance
“…Q indicator is expressed as below: 2.2.3 Material index, MT In material (MT) component, the main data required is focused on resources, product and inventory management. In lean practices, pull-based production is desired (Leong et al, 2018a). The MT indicator will assist the industrialist in identifying the optimum inventory capacity through its inventory storage data.…”
Section: Manpower Index Mpmentioning
confidence: 99%
See 4 more Smart Citations
“…Q indicator is expressed as below: 2.2.3 Material index, MT In material (MT) component, the main data required is focused on resources, product and inventory management. In lean practices, pull-based production is desired (Leong et al, 2018a). The MT indicator will assist the industrialist in identifying the optimum inventory capacity through its inventory storage data.…”
Section: Manpower Index Mpmentioning
confidence: 99%
“…The dependence on foreign technology exposes the local industrialist to several risks (i.e. monetary risk, geopolitical risk and local maintenance support) (Leong et al, 2018a). Moving on, environment components are rated as the second most significant component by the experts.…”
Section: Analytic Hierarchy Process (Ahp) Analysismentioning
confidence: 99%
See 3 more Smart Citations