2006
DOI: 10.1016/j.ijpe.2005.02.013
|View full text |Cite
|
Sign up to set email alerts
|

A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
60
0
3

Year Published

2009
2009
2019
2019

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 134 publications
(68 citation statements)
references
References 34 publications
0
60
0
3
Order By: Relevance
“…Fuzzy TOPSIS TOPSIS is a multi-criteria decision-making technique to rank different alternatives through numerical evaluations the decision maker performs with respect to certain criteria. Weights can also be specified for each criterion, in order to introduce a measure of the relative importance felt by the decision maker [24], [25]. The method is based on the consideration that the chosen alternative should have the shortest distance from the positive-ideal solution and the farthest distance from the negative ideal solution.…”
Section: The Proposed Methodologymentioning
confidence: 99%
“…Fuzzy TOPSIS TOPSIS is a multi-criteria decision-making technique to rank different alternatives through numerical evaluations the decision maker performs with respect to certain criteria. Weights can also be specified for each criterion, in order to introduce a measure of the relative importance felt by the decision maker [24], [25]. The method is based on the consideration that the chosen alternative should have the shortest distance from the positive-ideal solution and the farthest distance from the negative ideal solution.…”
Section: The Proposed Methodologymentioning
confidence: 99%
“…2011). There have been plenty of studies related with the TOPSIS method in the literature (Parkan & Wu, 1999;Gamberini et Chen & Hung, 2010;Tupenaite et at. 2010;Han&Liu, 2011;Aydogan, 2011;Huang & Peng, 2011;Chen, 2011;Sadi-Nezhad, Damghani, 2011;Kutlu & Ekmekc;ioglu, 2012;Awasthi & Chauhan, 2012).…”
Section: Fuzzy Topsismentioning
confidence: 99%
“…Kottas and Lau (1981) proposed a stochastic line balancing procedure and Sarin et al (1999) extended this work by adding more assumptions. Gamberini et al (2006) proposed a multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. Due to the high level of automation, assembly systems normally need significant amount of investment costs (Erel & Sarin, 1998).…”
Section: Introductionmentioning
confidence: 99%