2015
DOI: 10.1007/s00521-014-1789-4
|View full text |Cite
|
Sign up to set email alerts
|

A new neuro-dominance rule for single-machine tardiness problem with double due date

Abstract: In this study, the single-machine total weighted tardiness scheduling problem with double due date has been addressed. The neuro-dominance rule (NDR-D) is proposed to decrease the total weighted tardiness (TWT) for the double due date.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 43 publications
(45 reference statements)
0
2
0
Order By: Relevance
“…The Moora method is an easy and convenient method that can provide effective results with simple mathematical calculations within multi-criteria decision-making techniques. The Moora method is based on ratio analysis because of the normalized criterion values obtained by dividing each criterion value by the square root of the sum of squares of all criterion values, as shown in Equation (5). For each alternative in the Moora method, as shown in Equation 6; normalized values of the maximizing and minimizing criteria are aggregated within themselves.…”
Section: Moora (Multi-objective Optimization By Ratio Analysis)mentioning
confidence: 99%
See 1 more Smart Citation
“…The Moora method is an easy and convenient method that can provide effective results with simple mathematical calculations within multi-criteria decision-making techniques. The Moora method is based on ratio analysis because of the normalized criterion values obtained by dividing each criterion value by the square root of the sum of squares of all criterion values, as shown in Equation (5). For each alternative in the Moora method, as shown in Equation 6; normalized values of the maximizing and minimizing criteria are aggregated within themselves.…”
Section: Moora (Multi-objective Optimization By Ratio Analysis)mentioning
confidence: 99%
“…[4]. The total weighted delay cost was tried to be reduced in one study by applying two different delay costs according to the double delivery date and the time spent in delayed jobs [5]. Besides, a formulation study was carried out for the single-machine stochastic model to compensate for the delay of the ordered jobs and the delay of the delivery dates [6].…”
Section: Introductionmentioning
confidence: 99%