Rapid Prototyping Technology - Principles and Functional Requirements 2011
DOI: 10.5772/21486
|View full text |Cite
|
Sign up to set email alerts
|

A New Rapid Prototyping Process for Sheet Metal Parts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…Many scholars have used plate forging to produce unequal thickness parts. Generally, parts with thickened walls or functional elements can be fabricated by the combination of drawing/flanging with upsetting [1][2][3][4][5][6][7][8]. In this combination, a vertical wall is firstly formed by drawing or flanging, and then an upsetting operation is taken to increase the wall thickness or form functional elements.…”
Section: Introductionmentioning
confidence: 99%
“…Many scholars have used plate forging to produce unequal thickness parts. Generally, parts with thickened walls or functional elements can be fabricated by the combination of drawing/flanging with upsetting [1][2][3][4][5][6][7][8]. In this combination, a vertical wall is firstly formed by drawing or flanging, and then an upsetting operation is taken to increase the wall thickness or form functional elements.…”
Section: Introductionmentioning
confidence: 99%