“…Dispatched diesel DG assets, d ∈ D, may have transient response times being substantially lower than that associated with typical ESS assets (i.e., switching of ultra capacitor banks). To such an extent, to model slow transient behaviour of DG assets, and their energy contributions towards (2), we consider the following generic discrete first-order dynamics for each dispatched DG asset: Here we assume that the nominal active/reactive power of the respective DG asset, (P D,d nom , Q D,d nom ), are determined during sizing and planning phase [18].…”