2002
DOI: 10.1139/x02-004
|View full text |Cite
|
Sign up to set email alerts
|

A note on the slope correction and the estimation of the length of line features

Abstract: Length of line features, such as forest border, is among the ecologically interesting attributes estimated from forest inventories. In hilly terrain, observed line lengths must be corrected for slope. Contrary to the correction for standard area-related attributes (like volume per hectare), an overall correction of plot size is not sufficient, but the actual inclination of each individual line segment must be used for slope correction. This topic is discussed, and a mean correction factor is calculated as a fu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
3
0

Year Published

2007
2007
2022
2022

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…The slope and aspect were measured from the center of the plots. The slopes were corrected using the formula r' = r/cos 2 (a/2.1) as per [20], where r' is the corrected radius, r is a radius on the horizontal plane (5.64 m) and a is the slope angle. It was carried out so that the areas of the plots were not underestimated in slopy areas.…”
Section: Data Collection Methods and Data Analysismentioning
confidence: 99%
“…The slope and aspect were measured from the center of the plots. The slopes were corrected using the formula r' = r/cos 2 (a/2.1) as per [20], where r' is the corrected radius, r is a radius on the horizontal plane (5.64 m) and a is the slope angle. It was carried out so that the areas of the plots were not underestimated in slopy areas.…”
Section: Data Collection Methods and Data Analysismentioning
confidence: 99%
“…Rectangular sampling plots, each with an area of 500 m 2 (25 m × 20 m) were established at each study site based on Nepal's National Inventory Guideline [57]. Slope correction was carried out for plots on slopes with gradients of >10%, as slope correction is mainly applied for slopes exceeding 10% [58]. Slope angle was measured using a clinometer.…”
Section: Data Collectionmentioning
confidence: 99%
“…Finally, because all plots were measured in the field with the same radius for plot areas, a correction factor was applied to compensate for differences in slope ( = ( ) . , r = new plot radius, α = slope,Kleinn et al 2002).…”
mentioning
confidence: 99%