“…3, compares the optimal and greedy-based theoretical ARMSE curves as a function of the number of PMUs, when σ L = 0.5 (50%) and σ P MU = 0.001 (0.1%). The sequence based on the greedy placement algorithm (excluding the feeder at node 1) is M gr (N ) = {3, 7,13,15,10,14,8,12,5,11,6,9,4, 2}. Although the PMU placement is in general different for the two strategies (for up to 4 PMUs the optimal placement sets are…”