“…In some of the studies [18,41,52,53,56], the number of DER units in the distribution network is set by the authors and is increased from the minimum value to 100% (DER is connected to each potential integration location) while Monte Carlo simulations are performed at each increment. The Monte Carlo simulation is used for different purposes such as, to generate the DER location [17,18,20,22,41,47,50,52,53,56,57,60], size [17,18,20,47,53,56,57], connection phase in the three-phase distribution networks [50,57,60], type [22] and DER generation and load profiles scenarios [56].…”