2019
DOI: 10.1088/1755-1315/384/1/012063
|View full text |Cite
|
Sign up to set email alerts
|

A novel optimization method considering fluid production rate and division time for 2D reservoir

Abstract: The adjustment and control of the fluid production rates is one of the primary methods to increase the cumulative oil production for water flooding reservoir. In this article, the oil production optimization problem of two-dimensional water-flooding reservoir under the condition of fixed total fluid production rate is studied. The production process is divided into several segments. The relevance between the division time and the fluid production rate is considered. A novel optimization method considering both… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?