2017 Australasian Universities Power Engineering Conference (AUPEC) 2017
DOI: 10.1109/aupec.2017.8282469
|View full text |Cite
|
Sign up to set email alerts
|

A novel reliability oriented bi-objective unit commitment problem

Abstract: This paper presents a new solution to unit commitment for single-objective and multi-objective frameworks. In the first step, the total expected energy not supplied (TEENS) is proposed as a separate reliability objective function and at the next step, the multi-objective Pareto front strategy is implemented to simultaneously optimize the cost and reliability objective functions. Additionally, an integer based codification of initial solutions is added to reduce the dimension of ON/OFF status variables and also… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…Over the past decade, the majority of the studies on power outage have emphasized the analysis of reliability and sustainability. To understand the reliability concept, two important factors that should be considered are adequacy and security [5,6]. Adequacy refers to the uninterrupted power supply that will continuously provide light on facilities to end-users.…”
Section: Introduction 11 Background Studymentioning
confidence: 99%
“…Over the past decade, the majority of the studies on power outage have emphasized the analysis of reliability and sustainability. To understand the reliability concept, two important factors that should be considered are adequacy and security [5,6]. Adequacy refers to the uninterrupted power supply that will continuously provide light on facilities to end-users.…”
Section: Introduction 11 Background Studymentioning
confidence: 99%