2021
DOI: 10.1002/qre.3045
|View full text |Cite
|
Sign up to set email alerts
|

A novel single composite Shewhart‐EWMA control chart for monitoring the process mean

Abstract: Statistical process monitoring (SPM) literature recommends the combination of Shewhart and exponentially weighted moving average (EWMA) schemes to improve the ability of the standalone Shewhart and EWMA monitoring schemes in detecting small to large shifts. The resulting scheme is named combined (or composite) Shewhart‐EWMA (CSEWMA) scheme. In this paper, a new single composite Shewhart‐EWMA (denoted as SCSEWMA) scheme for monitoring the mean when the process parameters are known or unknown is proposed using a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 28 publications
0
5
0
Order By: Relevance
“…(3) Take P as reference, draw the weighted correlation graph G * of y; (4) Find the MCST of G * ; (5) Obtain the OTCCPG of y according to the MCST; (6) For every component pair (y i ,y j ) in the OTCCPG, establish its T 2 control chart K ij ; (7) Establish the T 2 control chart K to monitor the correlation shift of all the quality components. The number of T 2 control charts in this diagnostic system is p. When K is normal, the correlation of all the quality components is under control.…”
Section: Correlation Diagnosis Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…(3) Take P as reference, draw the weighted correlation graph G * of y; (4) Find the MCST of G * ; (5) Obtain the OTCCPG of y according to the MCST; (6) For every component pair (y i ,y j ) in the OTCCPG, establish its T 2 control chart K ij ; (7) Establish the T 2 control chart K to monitor the correlation shift of all the quality components. The number of T 2 control charts in this diagnostic system is p. When K is normal, the correlation of all the quality components is under control.…”
Section: Correlation Diagnosis Methodsmentioning
confidence: 99%
“…In the whole formation of the product's quality, process quality is the most basic session because the product's quality will be influenced by every process' quality directly or indirectly, so process quality control is the essence of quality management in manufacturing. Theory of statistical process control (SPC) and its tools, that is, control chart proposed by Shewhart, achieved the goal of univariate process quality management [1][2][3][4]. But in modern manufacturing, many processes contain more than one quality components.…”
Section: Introductionmentioning
confidence: 99%
“…The theory of statistical process control (SPC) and its tools, that is, the control chart proposed by Shewhart, achieved the goal of univariate process quality management [1][2][3][4]. However, in modern manufacturing, many processes contain more than one quality component.…”
Section: Introductionmentioning
confidence: 99%
“…The objective of managing univariate process quality was achieved by using Shewhart's control chart, which is a tool in the theory of statistical process control (SPC) 1 4 . But in modern manufacturing, there are many processes that involve more than one quality component.…”
Section: Introductionmentioning
confidence: 99%