“…In the first scenario, which was performed using the FCFS method, the processing of the jobs coming to the job-shop environment on the basis of their order has been performed. The considered flow of the jobs for each work station is shown to be as follows: (1) Work station 2 : J 1 (8, 6), J 2 (8, 10), J 3 (8,15), J 4 (9.5, 14), J 5 (12,16), J 6 (16, 18), J 7 (22, 16), J 8 (0, 11.2), J 9 (0, 24), J 10 (0, 23).…”