2022
DOI: 10.1016/j.susoc.2021.09.002
|View full text |Cite
|
Sign up to set email alerts
|

A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…Jabbari et al [25] proposed the scheduling problem for a customized production system consisting of a flow shop production line with a parallel assembly stage that produces various products in two stages. In the first stage of the production line, parts are produced using a flow shop production line, and in the second stage, products are assembled on one of the parallel assembly lines.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Jabbari et al [25] proposed the scheduling problem for a customized production system consisting of a flow shop production line with a parallel assembly stage that produces various products in two stages. In the first stage of the production line, parts are produced using a flow shop production line, and in the second stage, products are assembled on one of the parallel assembly lines.…”
Section: Literature Reviewmentioning
confidence: 99%