2022
DOI: 10.33223/epj/154519
|View full text |Cite
|
Sign up to set email alerts
|

A preliminary techno-economic analysis of the potential of using municipal waste gasification installations in a hybrid electricity generation system

Abstract: This paper presents the results of modeling and analysis of hybrid generation system (HSW). The system contains municipal waste gasification installation, photovoltaic (PV) system and wind farm. The system cooperates with the power system to provide electrical energy to the communal consumer. The consumer is characterized by a maximum power demand equal to 10 MW and an annual energy demand of 42.351 GWh. Generation with renewable sources was modelled using meteorological data. Moreover, in order to cover the d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 9 publications
0
0
0
Order By: Relevance