2013
DOI: 10.1080/21580103.2012.759163
|View full text |Cite
|
Sign up to set email alerts
|

A program for cost estimation of forest road construction using engineer's method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 16 publications
(14 citation statements)
references
References 6 publications
0
14
0
Order By: Relevance
“…In order to evaluate each alternative form future landslides point of view, we extracted the values of LS for the all road alternatives from the LSI map. Furthermore, we applied a cost estimation model, initially developed by Ghajar et al (2013) for the Caspian forest, to economically evaluate the road alternatives. The model incorporates five main cost elements in forest roads including clearing operations, embankment, pavement, grading, drainage and stream-crossing structures to calculate the total construction cost calculation.…”
Section: Designing and Assessing Road Network Alternativesmentioning
confidence: 99%
“…In order to evaluate each alternative form future landslides point of view, we extracted the values of LS for the all road alternatives from the LSI map. Furthermore, we applied a cost estimation model, initially developed by Ghajar et al (2013) for the Caspian forest, to economically evaluate the road alternatives. The model incorporates five main cost elements in forest roads including clearing operations, embankment, pavement, grading, drainage and stream-crossing structures to calculate the total construction cost calculation.…”
Section: Designing and Assessing Road Network Alternativesmentioning
confidence: 99%
“…Studies concerning road construction (Ghajar et al 2013), maintenance (Coulter et al 2006) and environmental concerns affecting the placement of roads in forests (Grayson et al 1993;Rummer et al 1997;Forsyth et al 2006;Jordán and Martínez-Zavala 2008. ) show big variety.…”
Section: Introductionmentioning
confidence: 99%
“…However, large areas of forest are destroyed during road construction, which results in both economic losses and environmental changes (Caliskan 2013). For lowvolume forest roads, construction and maintenance of roads are the largest proportion of the total cost of producing timber (Ghajar et al 2013). Therefore, forest road construction must be designed and executed with consideration of economic, environmental, and social requirements (Ozturk and Inan 2010).…”
Section: Introductionmentioning
confidence: 99%