2018
DOI: 10.20944/preprints201809.0494.v1
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

A Reliability-Centered Maintenance Study for an Individual Section Forming Machine

Abstract: This study investigated the breakdown trend in an automated production with an aim to recommend the application of Reliability-centered maintenance (RCM) for an improved productivity via a new preventive maintenance (PM) program. Individual Section-forming machine (ISM): a glass blowing machine for making glass bottles was used as the case study of an automated production system. The machine parts and the working mechanisms were analysed with a special focus on methods of processes and procedures that will ena… Show more

Help me understand this report
View published versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 11 publications
0
1
0
Order By: Relevance
“…List of electric power technical supervision equipment For CPR1000 nuclear power plant with equipment classification, the equipment classification results can be referred to to improve the identification efficiency of technical supervision equipment list [5][6], and mostly can be used the Reliability Centred Maintenance (RCM) method [7][8].…”
Section: List Of Nuclear Safety Supervision Equipmentmentioning
confidence: 99%
“…List of electric power technical supervision equipment For CPR1000 nuclear power plant with equipment classification, the equipment classification results can be referred to to improve the identification efficiency of technical supervision equipment list [5][6], and mostly can be used the Reliability Centred Maintenance (RCM) method [7][8].…”
Section: List Of Nuclear Safety Supervision Equipmentmentioning
confidence: 99%