A reliability test system for educational purposes-basic data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
195
0

Year Published

1998
1998
2020
2020

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 597 publications
(196 citation statements)
references
References 5 publications
1
195
0
Order By: Relevance
“…The average load of this EDN is 10.72 MW. The electrical data, reliability parameters and the network structure are given in [13][14][15]. The following cases are studied: For all the cases above, the equipment planned outage time equals the fault repair time, both are 6 hr, fault location time is 0.5 hr, fault isolation time is 0.5 hr, power transfer time is 0.5 hr, and switching operation time for planned outages is 0.1hr.…”
Section: Case Studiesmentioning
confidence: 99%
See 1 more Smart Citation
“…The average load of this EDN is 10.72 MW. The electrical data, reliability parameters and the network structure are given in [13][14][15]. The following cases are studied: For all the cases above, the equipment planned outage time equals the fault repair time, both are 6 hr, fault location time is 0.5 hr, fault isolation time is 0.5 hr, power transfer time is 0.5 hr, and switching operation time for planned outages is 0.1hr.…”
Section: Case Studiesmentioning
confidence: 99%
“…The test system is designed as RBTS-BUS6 developed at the University of Saskatchewan [13][14][15] and a large number of practical EDN have been studied.…”
Section: Case Studiesmentioning
confidence: 99%
“…As with the power grid test bed, there are no associated infrastructures or economies; therefore, it is difficult to create infrastructure-impact scenarios that can be used to map power system impacts to infrastructure and economic consequences. Rules-of-thumb for the costs of outages to customers can be developed (see, for example, [16]) but these rules are not specific to any particular scenario and include only direct economic impacts.…”
Section: Use Of Unrealistic Power Gridsmentioning
confidence: 99%
“…For example, heuristics about the cost of electricity outages could be used to automatically assign economic consequences to outages based on the lengths of the outages (see [16]). …”
Section: Consequence Analysismentioning
confidence: 99%
“…The appearance of previously generated system states can be controlled and reduced. GA has emerged as a powerful search tool used for search and optimization [8][9][10][11][12][13][14]. Ref.…”
Section: Introductionmentioning
confidence: 99%