A Review of Operation Planning and Distribution Network Optimization of AADC Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Besides, it's important to highlight that there is a history of tripping due to parallel operation that occurred last year -the ring is added to the selected sample as ring9 -due to huge flow with almost 660 A at one feeder head and 470 A at the other end. Accordingly, the high load flow caused tripping on overcurrent protection where all actual load flow measurements are collected through AADC real-time Distribution Management System (DMS) system powered by Spectrum Power 4.4 [4]. Typical current ratings of 11 kV cables in the ring varies from 285 to 340 A depending upon the sizes 240-300 sq.mm Copper.…”
Section: Load Flow Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…Besides, it's important to highlight that there is a history of tripping due to parallel operation that occurred last year -the ring is added to the selected sample as ring9 -due to huge flow with almost 660 A at one feeder head and 470 A at the other end. Accordingly, the high load flow caused tripping on overcurrent protection where all actual load flow measurements are collected through AADC real-time Distribution Management System (DMS) system powered by Spectrum Power 4.4 [4]. Typical current ratings of 11 kV cables in the ring varies from 285 to 340 A depending upon the sizes 240-300 sq.mm Copper.…”
Section: Load Flow Analysismentioning
confidence: 99%
“…-The NOP is preferred to at telemetered station (with remotely switching capabilities from centralized distribution management system) as far as possible, and have easy access by field operation staff (like: near to the roads, not inside private premises, ..etc.) [4].…”
Section: Introductionmentioning
confidence: 99%