1999
DOI: 10.1016/s0305-0483(98)00042-5
|View full text |Cite
|
Sign up to set email alerts
|

A review of scheduling research involving setup considerations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
290
0
32

Year Published

2003
2003
2017
2017

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 737 publications
(324 citation statements)
references
References 153 publications
2
290
0
32
Order By: Relevance
“…Dudek et al (1992); MacCarthy and Liu (1993), and also McKay et al (2002) have criticised scheduling research in general and the flowshop scheduling literature in particular regarding this gap. Similar conclusions can be found in literature reviews (see Graves, 1981;Allahverdi et al, 1999;Linn and Zhang, 1999;Vignier et al, 1999;Ruiz and Vázquez Rodríguez, 2010;Ribas et al, 2010) on different scheduling environments. Reisman et al (1997) conducted a statistical review on flowshop sequencing/scheduling research between years 1952-1994.…”
Section: Motivation For This Phd Thesissupporting
confidence: 75%
“…Dudek et al (1992); MacCarthy and Liu (1993), and also McKay et al (2002) have criticised scheduling research in general and the flowshop scheduling literature in particular regarding this gap. Similar conclusions can be found in literature reviews (see Graves, 1981;Allahverdi et al, 1999;Linn and Zhang, 1999;Vignier et al, 1999;Ruiz and Vázquez Rodríguez, 2010;Ribas et al, 2010) on different scheduling environments. Reisman et al (1997) conducted a statistical review on flowshop sequencing/scheduling research between years 1952-1994.…”
Section: Motivation For This Phd Thesissupporting
confidence: 75%
“…Em Maes e Wassenhove (1988) e Trigeiro et al (1989) são tratados apenas problemas de dimensionamento de lotes. Enquanto que em Lawler et al (1993), Allahverdi et al (1999) e Potts e Kovalyov (2000) são encontrados modelos de programação. No entanto, conforme Drexl e Kimms (1997) e Karimi et al (2003), a tendência mais recente é combinar o problema de dimensionamento de lotes às decisões de programação da produção (lot-sizing and scheduling problems ou lot-scheduling).…”
Section: Modelagemunclassified
“…This problem is denoted as Flow Shop Dependent Group Scheduling (FSDGS). Literature of the last decades extensively dealt with both FSGS and FSDGS problems as confirmed by the following three reviews performed by Allahverdi et al (1999), Cheng et al (2000) and Zhu and Wilhelm (2006), respectively. Hendizadeh et al (2008) and Salmasi and Logedran (2008) proposed a metaheuristic algorithm based on tabu search.…”
Section: Literature Reviewmentioning
confidence: 99%