“…Strong support from university management and industry Becerik-Gerber et al, 2011;Badrinath et al, 2016 10 Accreditation standards and requirements to guide the implementation of BIM within the curriculum Becerik-Gerber et al, 2011;Macdonald 2012;Panuwatwanich et al, 2013;Badrinath et al, 2016;11 Awareness of the IT among quantity surveyors Oladapo 2007 12 Clients' demand for the use BIM in their project Liu et al, 2010;Eadie et al, 2013 BIM provides fast, effective and efficient quantity take-off and cost estimation Aouad et al, 2007;Sabol, 2008;Cartlidge;Eastman et al, 2011;Zhou et al, 2012;Choi et al, Eadie et al, 2013;Thurairajah and Goucher, 2013 5 Time savings in the preparation of estimating costs Nassar, 2012;Bryde et al 2013;Eadie et al, 2013;Wu et al, 2014 6 Reduction of requests for information Smith, 2014;Franco et al, 2015 7 Clash detection to reduce design errors Eadie et al, 2013;Fung et al, 2014;Franco et al, 2015 8 Simplify cost checking and update Sylvester and Dietrich, 2010;Fung et al, 2014 9 Improved visualization for better understanding of designs for measurement and minimize omissions Sylvester and Dietrich, 2010;Thurairajah and Goucher, 2013 10 Automatic quantification of BOQs preparation Aouad et al, 2007;Autodesk, 2012;Zhou et al, 2012 11 Data storage in central coordinated model…”