2019
DOI: 10.1007/978-3-030-31362-3_39
|View full text |Cite
|
Sign up to set email alerts
|

A Review of the Regression Models Applicable to Software Project Effort Estimation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
13
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
2

Relationship

4
1

Authors

Journals

citations
Cited by 7 publications
(13 citation statements)
references
References 13 publications
0
13
0
Order By: Relevance
“…This paper intends to further enhance the accuracy of UCP based on the historical dataset [7]; so the UCP equation in Eq.8 is re-written (Eq.9) as a regression model - [3,6] by adding w 0 , w 1 , w 2 as the unknown parameters (or unknown weights).…”
Section: Our Proposed Methods -Adamucpmentioning
confidence: 99%
See 2 more Smart Citations
“…This paper intends to further enhance the accuracy of UCP based on the historical dataset [7]; so the UCP equation in Eq.8 is re-written (Eq.9) as a regression model - [3,6] by adding w 0 , w 1 , w 2 as the unknown parameters (or unknown weights).…”
Section: Our Proposed Methods -Adamucpmentioning
confidence: 99%
“…In Phase I, a placeholder for ๐‘‹1 = ๐‘‡๐‘ˆ๐ด๐‘Š x TCF x ECF ๐‘‹2 = ๐‘ˆ๐‘ˆ๐ถ๐‘Š x TCF x ECF will be created for the input arguments; training weighting ๐‘Š = (w 0 , w 1 , w 2 ) is thus transformed into variable objects with initial default values. In this way, the ๐‘ˆ๐ถ๐‘ƒ ๐‘ƒ๐‘Ÿ๐‘’๐‘‘๐‘–๐‘๐‘ก๐‘’๐‘‘ (๐‘Š) equation is given as Eq.10, identified as the linear regression model [3,6]:…”
Section: Experiments Designmentioning
confidence: 99%
See 1 more Smart Citation
“…Effort estimation of software development is a significant challenge in the process of software project building [1][2][3][4]. This process is likely the first phase to estimate the development resources (i.e., cost, time).…”
Section: Introductionmentioning
confidence: 99%
“…Then, starting from those factors, one can find out the corresponding effort by software size and fixed productivity factors -(20 person-hours). However, this method has been analysed in literature and it was shown that it has low accuracy in effort estimation [7,15,21].…”
Section: Introductionmentioning
confidence: 99%