2020
DOI: 10.1016/j.ijepes.2020.106148
|View full text |Cite
|
Sign up to set email alerts
|

A robust contingency-constrained unit commitment with an N-αk security criterion

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(9 citation statements)
references
References 21 publications
0
9
0
Order By: Relevance
“…Therefore, the demand response program (DRP) was used in [13] to improve the flexibility of the transmission network following the SCUC problem model, and the robust optimization was employed to model the uncertainties in the electrical and gas systems. The robust modeling of the SCUC was presented in [14], where they obtained an optimal robust solution in the worst-case scenario for the uncertainties of the network's equipment availability. Authors in [15] modeled the reliability-constrained SCUC scheme using electric vehicles (EVs) in parking lots and the DRP, where the modeling of load and EV uncertainties were addressed by a stochastic modeling approach.…”
Section: B Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…Therefore, the demand response program (DRP) was used in [13] to improve the flexibility of the transmission network following the SCUC problem model, and the robust optimization was employed to model the uncertainties in the electrical and gas systems. The robust modeling of the SCUC was presented in [14], where they obtained an optimal robust solution in the worst-case scenario for the uncertainties of the network's equipment availability. Authors in [15] modeled the reliability-constrained SCUC scheme using electric vehicles (EVs) in parking lots and the DRP, where the modeling of load and EV uncertainties were addressed by a stochastic modeling approach.…”
Section: B Literature Reviewmentioning
confidence: 99%
“…Authors in [15] modeled the reliability-constrained SCUC scheme using electric vehicles (EVs) in parking lots and the DRP, where the modeling of load and EV uncertainties were addressed by a stochastic modeling approach. References [9][10][11][12][13][14][15] used the DC-PF model in the SCUC scheme to achieve short computational times. In this model, due to the elimination of reactive power, voltage drop, and power loss variables, the computational error was expected to be significant.…”
Section: B Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…wileyonlinelibrary.com/iet-gtd 1 Events-driven RCUC [3], [9], [13] [3], [4], [5], [6], [7], [8], [9], [10] [11], [12] [8], [12] [3], [4], [5], [6], [7], [8], [9], [10], [11], [12], [11], [13] Indexes-driven RCUC [14], [15], [16], [18], [19], [20], [16] - [17], [21] [16], [17] [14], [15], [16], [17], [18], [19], [20], [21], long term (8760 h) and presented a long-term RCUC. Reference [14] discussed the benefit of small-capacity flexible generators within intra-day scheduling process and built up a multistage RCUC.…”
Section: Introductionmentioning
confidence: 99%