A Robust Coordinated Expansion Planning Model For Wind Farm-Integrated Power Systems With Flexibility Sources Using Affine Policies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
21
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 25 publications
(21 citation statements)
references
References 22 publications
0
21
0
Order By: Relevance
“…• Without loss of generality, a single-year planning horizon is considered rather than a multi-year one to reach a compromise between accuracy and tractability of the proposed model. • To capture interday/intraday variation/ramping of uncertain loads and power generation of RESs, a sufficient number of representative days (i.e., scenarios) is considered, obtained by the k-means clustering technique [27]. • A single scheduling period of each representative day is considered to be one hour both in grid-connected and islanded modes.…”
Section: Modeling Preliminaries and Problem Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…• Without loss of generality, a single-year planning horizon is considered rather than a multi-year one to reach a compromise between accuracy and tractability of the proposed model. • To capture interday/intraday variation/ramping of uncertain loads and power generation of RESs, a sufficient number of representative days (i.e., scenarios) is considered, obtained by the k-means clustering technique [27]. • A single scheduling period of each representative day is considered to be one hour both in grid-connected and islanded modes.…”
Section: Modeling Preliminaries and Problem Descriptionmentioning
confidence: 99%
“…Additionally, the quadratic line flow expressions are linearized using a piecewise linear approximation [30]. Finally, a constant marginal cost is utilized to eliminate the non-linearity of quadratic cost functions [27]. • It is assumed that an unscheduled islanding event might happen at each period of the representative days considered.…”
Section: Modeling Preliminaries and Problem Descriptionmentioning
confidence: 99%
“…Constraints (7) and (8) ensure that installed new circuits and renewable generation units are within their limits, and if they are constructed at scenario s, they will be available at subsequent scenarios. The active power balance at bus i and power flows through existing and new circuits are restricted by ( 9) and (10), respectively. The operation limits of generators limits and bus angles are enforced by ( 11)- (13).…”
Section: The Mathematical Modelmentioning
confidence: 99%
“…In the existing literature, while incorporating N-1 constraints into transmission expansion models is common practice, embedding conditions of SCCs into G&TEP models in the planning phase has been little discussed [8][9][10][11][12][13][14][15][16][17][18][19][20][21]. Ignoring SCC constraints may threaten the security of power grids because G&TEP reduces the equivalent network impedance, which, in turn, increases the short-circuit level of substations.…”
Section: Introductionmentioning
confidence: 99%