2023
DOI: 10.21272/jes.2023.10(1).g1
|View full text |Cite
|
Sign up to set email alerts
|

A Scheduling Model in Capturing Methane Gas from Methane Clathrates Deposits

U. O. Anyanwu,
O. C. Okafor,
C. A. Nkwor

Abstract: The execution of any project type, especially engineering-based projects, is usually time-based, efficiency-driven, and cost-effective. These factors are the deterministic parameters that engineer successful project completion. The application of scheduling models remains the best technique for achieving these three factors to their best degrees. Therefore, this study was centered on the impact study of applying the scheduling model in harvesting methane gas from methane clathrates deposits. Various data on ga… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 10 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?