2022
DOI: 10.1002/amp2.10141
|View full text |Cite
|
Sign up to set email alerts
|

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract: In a manufacturing system, production control-related decision-making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at di… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2
2

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 55 publications
0
2
0
Order By: Relevance
“…Limited machine capacity brings a layer of difficulty since multiple "individual-job" subproblems are considered together competing for limited resources (machines). Another difficulty arises because of uncertainties, including processing times [34][35][36][37][38][39] and scrap [40][41][42] . Re-manufacturing of one part may affect and disrupt the overall schedule within the entire job shop, thereby leading to unexpectedly high delays in production.…”
Section: Demonstration Of Convergence Of Multipliers Based On a Small...mentioning
confidence: 99%
“…Limited machine capacity brings a layer of difficulty since multiple "individual-job" subproblems are considered together competing for limited resources (machines). Another difficulty arises because of uncertainties, including processing times [34][35][36][37][38][39] and scrap [40][41][42] . Re-manufacturing of one part may affect and disrupt the overall schedule within the entire job shop, thereby leading to unexpectedly high delays in production.…”
Section: Demonstration Of Convergence Of Multipliers Based On a Small...mentioning
confidence: 99%
“…Limited machine capacity brings a layer of difficulty since multiple "individual-job" subproblem are considered together competing for limited resources (machines). Another difficulty arises because of uncertainties, including processing times [23][24][25][26][27][28] and scrap [29][30][31].…”
Section: Example 2: Stochastic Job-shop Scheduling With the Considera...mentioning
confidence: 99%