2006
DOI: 10.1108/17410380610642269
|View full text |Cite
|
Sign up to set email alerts
|

A simulation‐expert‐system‐based approach for machine sizing of production systems

Abstract: If you would like to write for this, or any other Emerald publication, then please use our Emerald for Authors service information about how to choose which publication to write for and submission guidelines are available for all. Please visit www.emeraldinsight.com/authors for more information. About Emerald www.emeraldinsight.comEmerald is a global publisher linking research and practice to the benefit of society. The company manages a portfolio of more than 290 journals and over 2,350 books and book series … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2007
2007
2014
2014

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 14 publications
0
1
0
1
Order By: Relevance
“…More sophisticated methods for dimensioning manufacturing systems exist, yet they are usually very specific and require a large modeling effort (e.g. computer simulation) (Feyzioglu et al, 2005;Masmoudi et al, 2006).…”
Section: Introductionmentioning
confidence: 99%
“…More sophisticated methods for dimensioning manufacturing systems exist, yet they are usually very specific and require a large modeling effort (e.g. computer simulation) (Feyzioglu et al, 2005;Masmoudi et al, 2006).…”
Section: Introductionmentioning
confidence: 99%
“…Tannock et al [25] berpendapat bahawa "anggapan" perlu dibuat untuk menetapkan situasi atau satu fenomena kerana sekiranya terdapat perubahan terhadap ciri-ciri data dalam kajian simulasi, maka keputusan ujian boleh diragui. Malah, Kumar dan Phronmathed [26], dan Wassim Masmoudi et al [27] turut memberikan pendapat sedemikian. Berikut akan menerangkan pengenalan kepada projek, dan pembentukan model simulasi dan pemungutan data termasuk pekerja, waktu bekerja, syif, dan masa pemprosesan.…”
Section: 30 Kaedah Kajianunclassified