2021
DOI: 10.1108/ci-04-2021-0062
|View full text |Cite
|
Sign up to set email alerts
|

A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences

Abstract: Purpose Health and safety training via immersive virtual reality (VR) in the construction sector is still limited to few early adopters despite the benefits it could provide in terms of training effectiveness. To foster its adoption, in this work, the authors address the lack of an organized asset of digital contents dedicated to the production of VR site scenarios that emerged as one of the most limiting factors for the implementation of building information modeling (BIM) and VR for construction workers’ saf… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
15
0
1

Year Published

2021
2021
2025
2025

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 35 publications
(16 citation statements)
references
References 55 publications
0
15
0
1
Order By: Relevance
“…The use of artificial intelligence has the potential to improve construction project management by automating routine tasks, providing real-time data analysis and enhancing project scheduling and cost control (Sacks et al , 2020; Pan and Zhang, 2021). Virtual reality has also been studied in the context of construction project planning and visualisation (Getuli et al , 2022; Ahmed, 2018).…”
Section: Background and Research Modelmentioning
confidence: 99%
“…The use of artificial intelligence has the potential to improve construction project management by automating routine tasks, providing real-time data analysis and enhancing project scheduling and cost control (Sacks et al , 2020; Pan and Zhang, 2021). Virtual reality has also been studied in the context of construction project planning and visualisation (Getuli et al , 2022; Ahmed, 2018).…”
Section: Background and Research Modelmentioning
confidence: 99%
“…; transportation machinery has transport trucks, pump trucks and transfer pumps, etc. ; vibrating and forming machinery has vibrators and spraying machinery [8]. Pumped concrete machinery can better adapt to the requirements of complex structures, narrow sites and tight schedules, and high construction efficiency.…”
Section: Types Of CMmentioning
confidence: 99%
“…The survey results show that industry dynamics are the leading factor for off-site construction in Ghana. Therefore, the rapid increase of housing deficit, the high cost of permanent land acquisition, the high cost of cast-in-situ construction, the use of prefabricated containers for construction, and the strong demand of the construction market restrict the development of the construction industry At present, the scheduling of a large number of CM and equipment is generally difficult, and the equipment cannot be reasonably allocated to different construction areas in a timely manner [5][6]. In order to solve this difficulty, this paper establishes an information management platform based on global positioning service to conduct real-time positioning and effective monitoring of CM and equipment, so that nearby equipment can be found in time when equipment scheduling is needed, and equipment scheduling can be completed as soon as possible.…”
Section: Introductionmentioning
confidence: 99%