2012
DOI: 10.1111/j.1467-8667.2012.00762.x
|View full text |Cite
|
Sign up to set email alerts
|

A Spatial‐Bayesian Technique for Imputing Pavement Network Repair Data

Abstract: Pavement construction and repair history is necessary for several pavement management functions such as developing pavement condition prediction models and developing maintenance and rehabilitation (M&R) trigger values based on past repair frequencies.It is often difficult to integrate M&R data with condition data since these data are often stored in disparate heterogeneous databases. This article provides a computational technique for estimating construction and M&R history of a pavement network from the spat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 32 publications
(15 citation statements)
references
References 29 publications
0
15
0
Order By: Relevance
“…NBC [39] is a member of the bayesian classifiers family [38,57]. It is designed for use when features are independent of one another within each class, but it appears to work well in prac-tice in other circumstances.…”
Section: Classification Methodsmentioning
confidence: 99%
“…NBC [39] is a member of the bayesian classifiers family [38,57]. It is designed for use when features are independent of one another within each class, but it appears to work well in prac-tice in other circumstances.…”
Section: Classification Methodsmentioning
confidence: 99%
“…In this context, fuzzy set theory could be applied to represent these uncertain characteristics more realistically. Since its introduction over 40 years ago (Zadeh, ), fuzzy set theory has been utilized to solve numerous infrastructure engineering issues (Adeli and Hung, ; Sarma and Adeli, , , ; Adeli and Karim, ; Samant and Adeli, ; Karim and Adeli, ; Jiang and Adeli, , ; Adeli and Jiang, , ; Bianchini and Bandini, ; Tagherouit et al., ; Anoop et al., ; Bianchini, ; Graf et al., ; Hsiao et al., ; Saliminejad and Gharaibeh, ; Li et al., ; Dell'Orco and Mellano, ), including tunnel‐related issues. For example, Harrison and Hudson () develop an expression for the fuzzy factor of safety and extend this method to evaluate the potential for underground rock spalling at the boundary of a circular excavation in terms of strength and in situ rock stress.…”
Section: Introductionmentioning
confidence: 99%
“…1). Based on this information, pavement condition prediction models can be created and assigned to the network pavement uniform segments (Braga, Čygas 2002;Saliminejad, Gharaibeh 2012;Sivilevičius, Petkevičius 2002). When these predictions are combined with the specific treatment policies, the PMS optimizes the extend and timing of the repairs using various algorithms, such as prioritization, enumeration, linear-, non-linear-and dynamic programming, genetic algorithm etc.…”
Section: Introductionmentioning
confidence: 99%